The Grove, Wooing Tree Estate

Date completed: Forecasted April 2027

Budget: Private

Location: Cromwell

Client: RW Cromwell Ltd

Role: Quantity Surveyor & Bank Funding

The Grove is a thoughtfully designed townhouse development located within the highly regarded Wooing Tree Estate; a master planned community known for its blend of modern living, landscaped open spaces, and Central Otago charm. Positioned amongst vineyards and close to Cromwell’s growing amenities, cycle trails, and outdoor attractions, The Grove reflects the lifestyle-focused vision that has made Wooing Tree Estate such a sought-after destination.

Set across a 5,000m² site, The Grove comprises 46 contemporary townhouses, offering a mix of two and three-bedroom homes designed for modern living. Civil works are being completed by Greenstone Civil, with the vertical build delivered by CKR Construction. The development has been carefully planned to combine functionality, quality construction, and low-maintenance living within one of Central Otago’s premier residential communities.

Fendalton, Private Residence

Date Completed: Forecasted Sept 2027

Budget: $8M

Location: Christchurch

Client: Private

Role: Project Management & Quantity Surveying Services

Located in Fendalton, this impressive private residence, designed by Sheppard & Rout and built by G B Construction, is progressing well. The bespoke home has been carefully designed to balance luxury living with functional family spaces, creating a refined and contemporary architectural statement.

The property features an extensive range of outdoor amenities, including a large swimming pool, spa, and pool house complete with a bar and entertaining area. A private tennis court further enhances the resort-style feel of the residence, with the project shaping up to be a standout home within one of Christchurch’s most sought-after suburbs.



The Alfred

Date Completed: Construction Stage

Location: Blenheim

Client: The Alfred Limited

Role: Project Management and Quantity Surveying Services

123 Bedroom Six Storey Hotel located in central Blenheim. The project will comprise a mixture of standard and luxury rooms and will be the most exciting addition to the Blenheim CBD since the ASB Theatre was built. The hotel will form part of the Marlborough Wine & Food Experience building (Formally the Clubs of Marlborough).

Moncrieff Avenue

Date Completed: Ongoing

Location: Nelson

Client: Private client overseas

Role: Engineer to the Contract

Stage 1 of this project involves a significant refurbishment of an existing property, on the fringe of a slip zone, with panoramic views of Nelson Bay.

Extensive internal modifications include modernising improvements whilst retaining original features and the character of the house. Extensive external modifications include a full reroof with location requiring the building to be fully tented.

Stage 2 consists of luxury new build studio, comprising a green roof, highest quality design and construction, sitting on the edge of a section overlooking Tasman Bay.

Extensive geotechnical work is required including ground anchors, shotcreting and reinforcing before construction of the superstructure can commence

Springlands Lifestyle Village Stage 7

Date Completed: June 2025

Location: Blenheim

Client: Metlife Care

Role: Project Management and Quantity Surveying services

Stage 7 of Springlands Lifestyle Village introduces 14 new villas to this boutique retirement community. This extension includes 7 duplex villa types, offering a mix of modern, low-maintenance homes designed for independent living. Surrounded by beautifully landscaped gardens, these villas seamlessly blend with the existing village and provide an ideal setting for relaxed retirement living.

Te Puna Mātauranga

Date completed: December 2024

Budget: $5M

Location: Nayland College, Nelson

Client: Ministry of Education

Role: Project Manager, Quantity Surveyor & Engineer to the Contract

Te Puna Mātauranga, formerly the Nayland College Library, was a Ministry of Education Weathertightness Remediation Programme project.

Originally constructed in 1965, the former library was significantly altered again around 2000, adding a series of spaces to the perimeter of the building and opening through to these from the inside. The building has suffered with repeated and ongoing weathertightness failure related to roof junctions and design solutions involving internal gutters and downpipes, arising from unconventional detailing, multiple penetrations, multiple roofing materials, insufficient roof pitch and flashing cover.

This project took the opportunity to reconfigure the entire roofing system, replacing all windows, doors, and external walls, and reform the building frontage to envisage a design that could present the traditional aspects of a wharenui frontage. Noble worked the the design team, MoE, kura and Ngāti Koata to reinvent this space into a safe and integrative space now known as Te Puna Mātauranga.

Kawarau Villas (Stage 2), Queenstown

Date completed: Forecasted April 2027

Budget: Private

Location: Queenstown

Client: Kawarau Developments Ltd

Role: Quantity Surveyor & Bank Funding

Kawarau Villas Stage 2 is the next stage of a wider residential development, delivering a thoughtfully designed medium-density community in a highly sought-after location. Situated on an approximately 8,000m² site, this stage comprises 93 modern townhouses across 10 blocks and two substages. Featuring a mix of one, two, and three-bedroom homes, the development has been designed to cater to a range of lifestyles while showcasing a high-quality approach to contemporary townhouse living.

Constructed by Brownie Construction and Greenstone Civil, Kawarau Villas has proven exceptionally popular with buyers. Complete with dedicated car parking and landscaped gardens, the development combines functionality, comfort, and smart urban design, all while enjoying stunning views of The Remarkables and close proximity to local amenities.

McGlashen Avenue Retail Development, Nelson

Date Completed: Forecasted October 2026

Location: Richmond, Nelson

Budget: $9.1M

Client: 40 McGlashen Avenue Limited

Role: Bank Funding

The McGlashen Avenue Retail Development is a landmark commercial project positioned on a prominent corner site within central Richmond and is set to bring an exciting mix of new businesses and services to the region. Comprising three separate buildings, including a food outlet with drive-through facilities, the development is designed to create a vibrant and convenient retail hub for the local community. Thoughtfully designed by JTB Architects and constructed by Wyatt Construction, the project combines functionality, accessibility, and modern urban design.


Sorted Logistics

Date Completed: In Progress (Multiple Stages)

Location: Auckland & Christchurch

Client: Sorted Logistics

Role: Quantity Surveying and Bank Funding


Several stages of large warehouse storage and logistics distribution centres totalling approximately 60,000m2 to date. Our service has included satisfying funders requirements, processing claims and variations and agreeing final accounts.

Neale Avenue

Date completed: In progress

Location: Nelson

Client: Redwood Group (For Kainga Ora)

Role: Project Manager, Engineer to the Contract & Quantity Surveyor



Stage 1 is fast track delivery of 26 Social Development Public Housing units for Kainga Ora consisting of a mix of one bed apartments, 2 & 3 bedroom town houses. The development is due to handover mid 2025

Stage 2, also fast track, will comprise 40 affordable housing units for private sale

Maitai Tahunanui Satellite

Date completed: 06 October 2023

Budget: $3.5m

Location: Tāhunanui, Nelson

Client: Ministry of Education – Capital Works

Role: Project Management & Quantity Surveying services

 
 

Maitai-Tāhunanui Satellite (named ‘Mahitahi’) is a 300m2 satellite teaching space for specialist school, Maitai Base, at Tāhunanui School.

The intention of the project has been to create a space that meets the diverse needs of some of Maitai’s students, whilst enabling integration between the specialist space and the host school

Consultation with several varied stakeholders and manawhenua, whilst navigating a complicated brief and introducing cultural narrative into the space, were key considerations of this project.

The result: a quality product, delivered within budget and in time for Term 4 2023.

Cawthron National Algae Research Centre

Date of completion: 2022

Budget: $3 Million

Location: Nelson

Client: Cawthron Research Institute 

Role: Project Management & Quantity Surveying

Cawthron Institute’s National Algae Research Centre (NARC) is a 435m2 facility sited at the Glenduan Cawthron Aquaculture Park, north of Nelson. It is a pragmatic, quality extension of the existing facility. The Institute is New Zealand’s largest private science organisation, with more than 300 scientists.

NARC offers a step-change in the Institute’s capacity to undertake research into how native red seaweed species can be harnessed to reduce livestock emissions when added to cattle feed, boost aquaculture yields, and be used for pain management. It allows the Institute’s scientists to further explore the economic and environmental value of different seaweed species and is a critical component in growing New Zealand’s aquaculture sector from $600m in 2020 to $3bn in 2035.

Cawthron Te Wero Aro-anamata

Date completed: 2022

Budget: $ 4.2 million

Location: Stoke, Nelson

Client: Cawthron Research Institute 

Role: Project Management  & Quantity Surveying Services

Redevelopment of a factory to house PC2 aquatic research laboratories for fin fish & shellfish research. The laboratories were fitted out to meet MPI accreditation and included the recirculating aquaculture systems to provide life support to fish and an onsite desalination/decontamination treatment plant for waste water.

Collingwood Area School

Date for completion: Feb 2024

Budget: $15.8 Million

Location: Collingwood, Tasman

Client: Ministry of Education

Role: Project Management & Quantity Surveying

Teaching Block

Re-development of Collingwood Area School offers an opportunity to provide facilities which enable 21st century learning and help to connect the wider community and local iwi with the school. the proposed new and revamped buildings will provide 230 students with quality learning environments which help foster collaboration between year groups, teaching staff, and community.

·       1000m2 new Teaching and library

building

·       300m2 new Administration & Resource

building

·       Refurbishment of existing Technology

building

·       New changing area to existing hall

·       ECI procurement model

Blessing of Administration Building

Golden Bay High School

Date for completion: April 2024

Budget: $25 Million

Location: Takaka, Tasman

Client: Ministry of Education

Role: Project Management & Quantity Surveying

Re-development of Golden Bay High School offers an opportunity to provide facilities which enable 21st century learning and help to connect the wider community and local iwi with the school. the proposed new and revamped buildings will provide 355 students with quality learning environments which help foster collaboration between year groups, teaching staff, and community.

·       813m2 new teaching and learning hub

·       807m2 new administration &

Wharenui building

·       421 m2 refurbishment technology

building

·       400m2 refurbishment of existing Hall

·       1047m2 refurbishment of existing

gymnasium

·       996m2 refurbishment of existing

science & art teaching building

·       207m2 refurbishment of existing

hospitality building

·       ECI procurement model

Takaka Co-Housing

Date Completed: Ongoing

Budget: $25M

Location: Takaka, Golden Bay

Client: Mohua Ventures

Role: Project Management & Quantity Surveying

The project comprises of a mixed development of approximately 100 residential units, 10 commercial units and community buildings over three stages/neighbourhoods.

Neighbourhood One is ongoing, which comprises of 17 duplex properties, 4 townhouses, a community house and a community shed. The 1st 10 units of Neighbourhood One are due for completion in the first quarter of 2023.

Wairarapa Terrace

2.png

A new high end private residence situated on the the banks of the Wairarapa Stream. This beautiful 500m2 home comes complete with a large swimming pool and private waterfront access to the Wairarapa Stream. The design incorporates some of the most advanced seismic strengthening design currently available and is designed well in excess of the current code requirements. The foundations also rest on a new gravel raft system which mitigates against liquefaction.

Date Completed: 2017

Budget: $3.5M

Location: Christchurch

Client: Chris & Jenny Stokes

Role: Project Management & Quantity Surveying Services

3.png

Cawthron Institute – Halifax Redevelopment Stage 1

Date Completed: 2013

Budget: $5M

Location: Nelson

Client: Cawthron Institute

Role: Project Management & Quantity Surveying

The Cawthron Institute is New Zealand’s largest independent research institute specialising in environmental research and research for the food and aquaculture industries. It also has substantial testing laboratories and provides seafood safety testing for key sectors of the aquaculture industry.

The new $5 million facility on its Halifax Street site will provide nearly 400 square metres of high specification laboratory space, to replace some of its present facilities built in the 1970s. In addition to laboratories the building will also include office space, meeting rooms and staff facilities.

This building is stage one of a four stage project to replace the facilities and laboratories in the Rigg building on the Halifax Street campus.  Two key requirements of the building’s design are sustainability and a design in keeping with the character of the neighbourhood.

The project includes the demolitions of existing structures.

Springlands Lifestyle Village

SLV21.png

Date Completed: ongoing

Budget: $50M

Location: Blenheim

Client: Springlands Lifestyle Village

Role: Project Management and Quantity Surveying services

2.jpg

A boutique style retirement village set in beautifully landscaped gardens. Comprising 78 Villas, 26 Apartments, 56 Care Rooms and a luxurious community centre. This project has won two awards including the National Winner of the Registered Master Builders Commercial Projects Award

108 Park Terrace

Date Completed: October 2022

Location: Christchurch

Role: Project Management & Quantity Surveying Services

A prestigious apartment development located on the edge of Hagley Park with views over the Avon River. Constructed over six floors with a covered ground floor parking, each apartment has large open plan living, high quality fittings and finishes and outdoor living areas.